Highlights
View Details- Magnetic Gold Ultra™ lacquered steel dry erase surface is recommended for frequent use.
- Pale gray grid lines make planning easy and make for a professional-looking board.
- Sliding aluminum pen tray keeps pens and magnetic accessories where you want them.
Gridded Magnetic Steel Dry Erase Project Planning Board, 1" x 2" Cells, 36" x 24", White Surface, Satin Aluminum Frame
Log in to see pricing
Organization is vital for the success of every business or enterprise. Planning boards are excellent tools that allow you to keep planning and tracking on time. Keeping important tasks on display, organizing work-groups or just planning ahead is practical and easy. Pale gray grid lines help ensure easy alignment of text and magnetic accessories. Magnetic lacquered steel dry erase surface is suitable for frequent use and allows you to post notes and messages as well as write. Sturdy aluminum frame features a sliding pen tray and an easy four-corner mounting system. Includes mounting kit.
- Magnetic Gold Ultra™ lacquered steel dry erase surface is recommended for frequent use.
- Pale gray grid lines make planning easy and make for a professional-looking board.
- Sliding aluminum pen tray keeps pens and magnetic accessories where you want them.
- Four-corner system for easy mounting.
| Manufacturer # | MA0392830A |
| Board Surface Type(s) | Dry Erase |
| Global Product Type | Preformatted Dry Erase Boards |
| Magnetic Board Surface | Yes |
| Surface Use Rating | Heavy/Frequent Use |
| Surface Material | Gold Ultra™ Lacquered Steel |
| Surface Color | White |
| Dedicated Projection Screen | No |
| Flipchart Mounting System | No |
| Frame Material | Aluminum |
| Frame Color/Finish | Satin |
| Preformatted Board Surface | Yes |
| Supports Custom Surface Formatting | No |
| Grid Columns | 17 |
| Grid Rows | 23 |
| Mounting Details | Four-Corner Wall-Mount System (Included) |
| Product Biodegradability in Days | 0 |
| Package Includes | (10) Card Holders |
| Package Includes | (1) Set of Magnetic Shapes |
| Package Includes | Accessory Tray |
| Package Includes | Mounting Kit |
| Compliance Standards | ISO 9001-2008 |
| Pre-Consumer Recycled Content Percent | 0% |
| Post-Consumer Recycled Content Percent | 0% |
| Total Recycled Content Percent | 0% |
Organization is vital for the success of every business or enterprise. Planning boards are excellent tools that allow you to keep planning and tracking on time. Keeping important tasks on display, organizing work-groups or just planning ahead is practical and easy. Pale gray grid lines help ensure easy alignment of text and magnetic accessories. Magnetic lacquered steel dry erase surface is suitable for frequent use and allows you to post notes and messages as well as write. Sturdy aluminum frame features a sliding pen tray and an easy four-corner mounting system. Includes mounting kit.
- Magnetic Gold Ultra™ lacquered steel dry erase surface is recommended for frequent use.
- Pale gray grid lines make planning easy and make for a professional-looking board.
- Sliding aluminum pen tray keeps pens and magnetic accessories where you want them.
- Four-corner system for easy mounting.
| Attribute Name | Attribute Value |
|---|
